
Add to Cart
Produce Name : Steel Tubes for Heat transfer A 178 SA 178 A/C/D , A 209 SA 209 A 213 SA 213 T2 T5 T5b T5c T9 T11 T12 T17 T21 T22 T23 T
Best Engineering has successfully completed the chimney project at Tata Steel . The chimneys of converters 21 and 22 have been replaced. The new chimneys have been prefabricated and then transported to Tata. The chimney of converter 22 was first replaced and the chimney of converter 21 subsequently. The torch tops of the chimneys were removed followed by the rest of the chimneys. The lifting and placement of the new chimneys has been successfully been carried out.
PER+ project Shell
Scope:
The supply and erection of steel structures for Power Plant Control Area and PSU’s Control Area.
Details:
Weight: 5.800 tonnes
ISO 9001 : 2015
ISO 3834.2: 2005
ISO 14001 : 2015
OHSAS 18001 : 2007
SCC Petrochemical
CPR / EN-1090.1
PED 2014_68_EU Module H
PED 2014_68_EU Module H1